AXIA prepares fire alarm designs from your building drawings: the layout of detectors, manual call points and sounders, the loop diagram, cable lengths and a full equipment specification. Designs take into account the requirements of Government of Georgia Decree No. 41 and use equipment certified to EN 54.
What the design includes
- Layout plan for detectors, manual call points and sounders
- Loop diagram and cable routing
- Control panel selected for the size of the site, with no oversized system
- Equipment and cable specification
- A set of certificates and declarations of performance for expert review
Which standards we work to
For fire alarm systems, Decree No. 41 refers to NFPA 72, and Article 102.3 allows other equivalent standards. Compliance of EN 54 certified equipment is therefore shown with CPR certificates and declarations of performance. It is best to agree this approach with the expert reviewer in advance. See Compliance and certificates for details.
How the work goes
- Send us the building drawing: PDF, DWG, DXF, JPG or PNG.
- We establish the site requirements and choose a suitable system.
- We prepare the layout plan, loop diagram and specification.
- You receive a commercial offer within 1 business day.
- If needed, we carry out installation, commissioning and handover.
Equipment and experience
We work with addressable systems by POLON-ALFA, including the POLON 6000 series. See the full range in the fire safety catalogue. AXIA has more than 150 completed projects.
Upload a project for a quote or call us: 0322 05 08 28.
Frequently asked questions
How much does a fire alarm design cost?
The price depends on the floor area, the number of storeys and the type of system. After you send the drawing, you receive a commercial offer within 1 business day.
What files do you need for the design?
A building drawing in PDF, DWG, DXF, JPG or PNG format. Each file can be up to 25 MB.
Is a fire alarm mandatory in my building?
It depends on the class and use of the building. Decree No. 41 applies to class III–V buildings. We can help you determine the requirements from your drawing.
What standard does the equipment meet?
We use equipment certified to EN 54, and we provide the certificates and declarations as one set for expert review.